General technical requirements for automatic spray control valves for hydraulic supports

People's Republic of China Ministry of Coal Industry 1997-12-30 approved 1998-06-01 implementation

1 Scope

This standard specifies the requirements of automatic spray control valve with hydraulic support, test methods, inspection rules, signs, packaging, transportation and storage.

This standard applies to coal mine hydraulic support with a variety of automatic spray control valve.

2 reference standard

The following standards contain provisions that, through reference in this standard, constitute provisions of this standard. At the time of publication, the editions indicated were valid. All standards will be revised, the parties using this standard should explore the possibility of using the latest version of the standard.

GBl91-90 packaging and storage pictorial signs

GB / T 6388-86 transport package delivery mark

GB / T 13264-91 nonconforming rate of small batch sampling inspection procedures and sampling tables

GB / T14437-93 product quality count of a supervised sampling inspection procedures (for a larger total amount of cases)

GB / T15482-1995 Product Quality Supervision, a small overall count of a sample test procedures and sampling table

MT 76-83 hydraulic support with emulsified oil

3 definition

This standard uses the following definition.

3.1 hydraulic support with automatic spray control valve

It is installed on the coal mine hydraulic support and connected with the corresponding hydraulic pipeline. When the corresponding handle of the support is used to make the support move, the device which uses the working fluid to automatically open or close the spray waterway (hereinafter referred to as the control valve) is installed.

3.2 working liquid operating emulsion

The control valve to open or close and have a certain pressure emulsion.

3.3 open pressure opening pressure

The minimum pressure required to open the control valve, in MPa. 4 requirements

Control valves shall comply with the provisions of this standard and shall be manufactured in accordance with the drawings and technical documents approved by the prescribed procedures.

4.1 using the ambient temperature

In the ambient temperature 4 ~ 40 ℃ under normal conditions.

4.2 appearance

Surface smooth, smooth, and should be anti-corrosion protection layer, the protective layer should be uniform, no flaking, no scratches; shell deformation, cracking, corrosion and mechanical damage; clearly marked water inlet, outlet and working fluid into the liquid hole ; Nameplate installed securely, writing clearly.

4.3 interface

Inlet, outlet and working fluid into the liquid hole interface should be quick connector form, interface size and surface roughness should be consistent with the standard Appendix A (standard appendix) requirements, the interface after the test without water leakage phenomenon.

4.4 strength

Control valve fluid rated pressure of 32MPa, from the control valve inlet 1.5 times the rated working pressure test, no liquid discharge, the shell and parts do not produce any deformation or damage.

4.5 resistance loss

When the water flows through the control valve at 20L / min, the pressure difference between the inlet and outlet ports should not exceed 0.1MPa.

4.6 open the pressure

Water pressure in the range of 1.0 ~ 7.0MPa, the opening pressure should not exceed 2MPa.

4.7 Use water pressure

In the use of water pressure of 1.0 to 7. oMPa range of test control valve should be able to normally open and close the test process control valve can not be automatically opened or closed phenomenon.

4.8 service life

After 4 000 cycles, the seal shall comply with 4.9.

4.9 sealed

Table 1 sealed test method for testing, the test pressure should be no pressure drop.

Working fluid rated pressure and the use of water pressure range, after 2h regulator test, the working fluid should not have pressure drop.

5 test methods

5.1 Test System

Test system shown in Figure 1.

Hydraulic support with automatic spray control valve test system

5.2 Test equipment and equipment

5.2.1 Pressure gauge: Range of 0 ~ 1.6MPa and 0 ~ 40MPa two, accuracy of 1.5.

5.2.2 meter: rated pressure ≥ 7.0MPa, rated flow ≥ 30L / min.

5.2.3 stopwatch: ordinary mechanical stopwatch or electronic stopwatch.

5.2.4 spray pump: rated pressure ≥ 7.0MPa, rated flow ≥ 30L / min.

5.2.5 working fluid pump: rated pressure ≥ 32MPa.

5.2.6 valve: hydraulic support with a valve.

5.2.7 Counter: Blood cell counter.

5.2.8 Pressure device: rated pressure ≥ 48MPa.

5.3 Test conditions

5.3.1 Test spray water temperature 4 ℃ ~ 40 ℃.

5.3.2 Test Working Fluid The emulsified oil or rust-proof low-condensable 5 # hydraulic oil formulated by MT 76-83 emulsified oil and neutral soft water according to 5:95 weight ratio is used.

5.3.3 working fluid temperature control at 10 ℃ ~ 50 ℃.

5.3.4 spray water and working fluid should be filtered with a filter accuracy of 0.125mm filter.

5.3.5 The outlet of the control valve should be connected with a certain number of nozzles so as to meet the requirements of the flow rate when the resistance is measured.

5.4 Test items and methods

Control valve test items and methods in Table 1.

Table 1 control valve test items and methods

Serial number

Pilot projects

experiment method

1

Use the ambient temperature

In the ambient temperature 4 ℃ ~ 40 ℃ under the conditions of the test

2

Exterior

Visual inspection

3

interface

Will be tested control valve access test system, into the water hole water supply to the working fluid into the liquid hole for the working fluid for 2min. Observe each hole seepage or working fluid

4

strength

Using pressure device, from the control valve into the liquid inlet pressure to 1.5 times the rated working pressure, for 5min

5

Resistance loss

Open the control valve, the water flow to 20L / min, record the control valve inlet and outlet across the pressure difference

6

Open the pressure

Close the control valve, the water supply pressure was adjusted to 1.0,7.0MPa; working fluid pressure adjusted to 0.1 MPa below, and then set the valve to open the control valve position, and gradually increase the working fluid pressure until just Open the control valve so far and record the highest pressure gauge reading with the control valve open. Two kinds of pressure were tested five times in a row

7

Use water pressure

The water supply pressure was adjusted to 7.0,1.0MPa, and then open or close the control valve for 5min; two kinds of pressure were continuous test 5 times

8

Life test

The working fluid pressure is adjusted to 5 ~ 6MPa, water pressure adjusted to 1.5 ~ 2.0MPa; and then open the control valve, when the water passed immediately shut down to complete a cycle. Accumulated 4000 times

9

seal

(1) After the completion of life test (factory inspection does not require);